Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Prototype Precise Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
62,446,169.18
ISK
Sell Value
0.00
Profit
-62,446,169.18
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 59,510,000.00
27 1,353.24
32 5,635.20
33 2,643.30
Material Total 59,519,631.74
System Cost Index (0.14%) 98,965.03
SCC Surcharge (4%) 2,827,572.40
Job Installation Cost 2,926,537.44
Grand Total 62,446,169.18

Production Timeline

d
Assembly 5h 26m 24s
1
Prototype Precise Dual 1000mm Railgun
Prototype Precise Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills