Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dread Guristas XL Torpedo Launcher Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
186,370,542.30
ISK
Sell Value
390,000,000.00
Profit
+203,629,457.70
ISK
Margin
52.2%
Build Time
5h 26m 24s
1 run

Materials

7 items
Material Quantity Unit Price Total
1 167,590,909.09
18 511,586.64
21 1,533.84
23 1,173.00
29 8,424,845.39
34 1,369,132.74
44 341.00
Material Total 177,899,521.70
System Cost Index (0.14%) 286,459.63
SCC Surcharge (4%) 8,184,560.97
Job Installation Cost 8,471,020.60
Grand Total 186,370,542.30

Production Timeline

d
Assembly 5h 26m 24s
1
Dread Guristas XL Torpedo Launcher
Dread Guristas XL Torpedo Launcher M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills