Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ametat II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
19,919,582.06
ISK
Sell Value
25,000,000.00
Profit
+5,080,417.94
ISK
Margin
20.3%
Build Time
1h 13m 39s
1 run

Materials

8 items
Material Quantity Unit Price Total
Ametat I
1 10,210,000.00
3 1,790.58
17 337,931.44
22 473,192.72
26 2,029,483.30
38 1,105,800.00
44 4,870,891.08
65 299,455.00
Material Total 19,328,544.12
System Cost Index (0.14%) 19,986.79
SCC Surcharge (4%) 571,051.15
Job Installation Cost 591,037.94
Grand Total 19,919,582.06

Production Timeline

d
Assembly 1h 13m 39s
1
Ametat II
Ametat II M
1 job, 1 run 1h 13m 39s/job 1h 13m 39s
Total Wall Clock Time 1h 13m 39s