Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Equite I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
5,903,316.92
ISK
Sell Value
4,558,885.50
Profit
-1,344,431.42
ISK
Margin
-29.5%
Build Time
1h 21m 36s
1 run

Materials

7 items
Material Quantity Unit Price Total
360 1,055,088.00
450 649,188.00
810 602,494.20
5,400 1,297,998.00
13,500 777,870.00
40,500 740,340.00
148,500 555,390.00
Material Total 5,678,368.20
System Cost Index (0.14%) 7,606.96
SCC Surcharge (4%) 217,341.76
Job Installation Cost 224,948.72
Grand Total 5,903,316.92

Production Timeline

d
Assembly 1h 21m 36s
1
Equite I
Equite I M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills