Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Zeugma Integrated Analyzer Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
435,622,242.90
ISK
Sell Value
530,735,483.87
Profit
+95,113,240.97
ISK
Margin
17.9%
Build Time
16m 20s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 883,369.31
1 843,900.00
90 54,065,612.70
90 73,138,805.10
90 306,562,268.70
Material Total 435,493,955.81
System Cost Index (0.14%) 4,338.21
SCC Surcharge (4%) 123,948.88
Job Installation Cost 128,287.09
Grand Total 435,622,242.90

Production Timeline

d
Assembly 16m 20s
1
Zeugma Integrated Analyzer
Zeugma Integrated Analyzer M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s