Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Minokawa Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,860,526,860.44
ISK
Sell Value
4,985,000,000.00
Profit
+1,124,473,139.56
ISK
Margin
22.6%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
9 118,530,000.00
9 89,631,000.00
9 156,049,411.77
14 173,892,121.20
9 122,040,000.00
18 234,807,187.50
5 91,012,658.25
5 30,500,000.00
14 168,392,000.00
9 75,092,749.02
23 219,765,000.00
14 223,860,000.00
8 112,160,000.00
29 588,103,584.84
5 437,758,333.35
360 16,006,089.60
180 14,506,925.40
1 170,083,333.33
1 699,938,095.24
Material Total 3,742,128,489.50
System Cost Index (0.14%) 4,003,809.65
SCC Surcharge (4%) 114,394,561.29
Job Installation Cost 118,398,370.94
Grand Total 3,860,526,860.44

Production Timeline

d
Assembly 12d 14h 13m
1
Minokawa
Minokawa M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills