Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Lif Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,670,462,963.09
ISK
Sell Value
5,298,000,000.00
Profit
+1,627,537,036.91
ISK
Margin
30.7%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
9 118,800,000.00
9 90,222,038.19
9 155,700,000.00
14 174,468,866.04
9 131,130,000.00
18 253,892,426.22
5 91,211,976.05
5 30,500,000.00
14 168,700,000.00
9 75,205,294.11
23 220,018,000.00
14 227,469,497.22
8 113,753,949.60
29 359,129,565.19
5 440,217,605.65
360 16,563,560.40
180 14,502,502.80
1 170,675,471.70
1 702,227,659.57
Material Total 3,554,388,412.74
System Cost Index (0.14%) 3,925,226.34
SCC Surcharge (4%) 112,149,324.01
Job Installation Cost 116,074,550.35
Grand Total 3,670,462,963.09

Production Timeline

d
Assembly 12d 14h 13m
1
Lif
Lif M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills