Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

CONCORD 25000mm Steel Plates Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
207,040,006.54
ISK
Sell Value
358,471,532.85
Profit
+151,431,526.31
ISK
Margin
42.2%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 138,596,153.85
9 20,133,000.00
12 22,807,228.80
18 17,160,438.42
Material Total 198,696,821.07
System Cost Index (0.14%) 282,136.71
SCC Surcharge (4%) 8,061,048.76
Job Installation Cost 8,343,185.47
Grand Total 207,040,006.54

Production Timeline

d
Assembly 5h 26m 24s
1
CONCORD 25000mm Steel Plates
CONCORD 25000mm Steel Plates M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills