Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Rabisu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
141,270,523.03
ISK
Sell Value
0.00
Profit
-141,270,523.03
ISK
Margin
0.0%
Build Time
1d 12h 16m
1 run

Materials

17 items
Material Quantity Unit Price Total
11 6,565.46
21 2,324,743.47
68 645,562.08
68 1,978,800.00
81 1,742,307.57
135 3,315,500.10
237 4,711,161.84
290 849,932.00
675 28,068,666.75
1,152 1,661,921.28
1,620 70,038,043.20
2,025 9,329,175.00
2,306 1,715,248.92
9,358 2,249,382.46
39,028 2,248,793.36
149,060 2,724,816.80
593,884 2,221,126.16
Material Total 135,831,746.45
System Cost Index (0.14%) 183,919.98
SCC Surcharge (4%) 5,254,856.60
Job Installation Cost 5,438,776.58
Grand Total 141,270,523.03

Production Timeline

d
Assembly 1d 12h 16m
1
Rabisu
Rabisu M
1 job, 1 run 1d 12h 16m/job 1d 12h 16m
Total Wall Clock Time 1d 12h 16m

Required Skills