Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Caedes Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,177,308.51
ISK
Sell Value
0.00
Profit
-14,177,308.51
ISK
Margin
0.0%
Build Time
18h 8m 1s
1 run

Materials

16 items
Material Quantity Unit Price Total
3 1,790.58
3 332,106.21
14 301,139.58
14 343,829.64
21 199,364.76
27 785,700.00
31 44,721.84
54 2,245,493.34
62 1,232,455.84
80 59,505.60
149 6,441,770.64
270 1,243,890.00
361 86,773.57
2,655 152,981.10
5,520 100,905.60
20,519 76,741.06
Material Total 13,649,169.36
System Cost Index (0.14%) 17,859.78
SCC Surcharge (4%) 510,279.37
Job Installation Cost 528,139.15
Grand Total 14,177,308.51

Production Timeline

d
Assembly 18h 8m 1s
1
Caedes
Caedes M
1 job, 1 run 18h 8m 1s/job 18h 8m 1s
Total Wall Clock Time 18h 8m 1s

Required Skills