Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Caedes Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,377,360.23
ISK
Sell Value
0.00
Profit
-14,377,360.23
ISK
Margin
0.0%
Build Time
18h 8m 1s
1 run

Materials

16 items
Material Quantity Unit Price Total
3 1,904.07
3 438,723.03
14 263,146.66
14 420,420.00
21 192,786.30
27 785,160.00
31 40,087.34
54 2,376,531.90
62 1,164,360.00
80 56,140.80
149 6,110,911.67
270 1,620,210.60
361 65,752.54
2,655 130,413.60
5,520 102,175.20
20,519 78,177.39
Material Total 13,846,901.10
System Cost Index (0.14%) 17,938.23
SCC Surcharge (4%) 512,520.90
Job Installation Cost 530,459.13
Grand Total 14,377,360.23

Production Timeline

d
Assembly 18h 8m 1s
1
Caedes
Caedes M
1 job, 1 run 18h 8m 1s/job 18h 8m 1s
Total Wall Clock Time 18h 8m 1s

Required Skills