Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Porpoise Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
93,300,984.75
ISK
Sell Value
112,000,000.00
Profit
+18,699,015.25
ISK
Margin
16.7%
Build Time
2h 16m 1s
1 run

Materials

7 items
Material Quantity Unit Price Total
3,240,000 12,117,600.00
607,500 11,105,100.00
151,875 8,751,037.50
81,000 19,469,970.00
30,375 22,593,532.50
5,063 7,304,086.32
2,835 8,308,818.00
Material Total 89,650,144.32
System Cost Index (0.14%) 123,458.37
SCC Surcharge (4%) 3,527,382.06
Job Installation Cost 3,650,840.43
Grand Total 93,300,984.75

Production Timeline

d
Assembly 2h 16m 1s
1
Porpoise
Porpoise M
1 job, 1 run 2h 16m 1s/job 2h 16m 1s
Total Wall Clock Time 2h 16m 1s

Required Skills