Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Basic Large Ship Manufacturing Time Efficiency I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
318,432,577.97
ISK
Sell Value
690,000,000.00
Profit
+371,567,422.03
ISK
Margin
53.9%
Build Time
27m 13s
1 run

Materials

9 items
Material Quantity Unit Price Total
864 65,280,444.48
1,296 4,231,440.00
1,440 95,041,972.80
1,440 15,177,600.00
1,440 5,777,366.40
1,440 103,651,200.00
1,440 316,699.20
1,440 440,107.20
1,440 28,152,000.00
Material Total 318,068,830.08
System Cost Index (0.14%) 12,300.65
SCC Surcharge (4%) 351,447.23
Job Installation Cost 363,747.89
Grand Total 318,432,577.97

Production Timeline

d
Assembly 27m 13s
1
Standup M-Set Basic Large Ship Manufacturing Time Efficiency I
Standup M-Set Basic Large Ship Manufacturing Time Efficiency I M
1 job, 1 run 27m 13s/job 27m 13s
Total Wall Clock Time 27m 13s

Required Skills