Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set ME Research Cost Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
677,612,592.88
ISK
Sell Value
1,425,000,000.00
Profit
+747,387,407.12
ISK
Margin
52.4%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
15 39,726,088.05
15 182,850.00
15 2,422,342.95
630 123,451,839.00
630 52,750,000.80
630 332,136,000.00
630 33,548,753.70
630 609,380.10
630 2,667,420.00
1,170 83,397,600.00
Material Total 670,892,686.10
System Cost Index (0.14%) 227,243.22
SCC Surcharge (4%) 6,492,663.56
Job Installation Cost 6,719,906.78
Grand Total 677,612,592.88

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set ME Research Cost Optimization II
Standup M-Set ME Research Cost Optimization II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII