Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set ME Research Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
6,759,189,493.44
ISK
Sell Value
14,970,000,000.00
Profit
+8,210,810,506.56
ISK
Margin
54.8%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
144 381,370,445.28
144 1,755,360.00
144 23,254,492.32
6,300 1,234,518,390.00
6,300 527,500,008.00
6,300 3,321,360,000.00
6,300 335,487,537.00
6,300 6,093,801.00
6,300 26,674,200.00
11,700 833,976,000.00
Material Total 6,691,990,645.10
System Cost Index (0.14%) 2,272,424.82
SCC Surcharge (4%) 64,926,423.51
Job Installation Cost 67,198,848.34
Grand Total 6,759,189,493.44

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set ME Research Optimization II
Standup L-Set ME Research Optimization II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII