Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dagon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,750,212,596.39
ISK
Sell Value
0.00
Profit
-4,750,212,596.39
ISK
Margin
0.0%
Build Time
15d 2h 40m
1 run

Materials

21 items
Material Quantity Unit Price Total
8 105,600,000.00
9 90,222,038.19
27 467,100,000.00
18 224,317,113.48
19 276,830,000.00
9 126,946,213.11
9 164,181,556.89
6 36,600,000.00
9 108,450,000.00
15 125,342,156.85
27 258,282,000.00
18 292,460,782.14
9 127,973,193.30
15 261,759,646.35
15 185,756,671.65
5 415,000,000.00
5 440,217,605.65
360 16,563,560.40
180 14,502,502.80
1 170,675,471.70
1 702,227,659.57
Material Total 4,611,008,172.08
System Cost Index (0.14%) 4,707,395.99
SCC Surcharge (4%) 134,497,028.32
Job Installation Cost 139,204,424.31
Grand Total 4,750,212,596.39

Production Timeline

d
Assembly 15d 2h 40m
1
Dagon
Dagon M
1 job, 1 run 15d 2h 40m/job 15d 2h 40m
Total Wall Clock Time 15d 2h 40m

Required Skills