Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Chemosh Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,541,693,826.40
ISK
Sell Value
0.00
Profit
-2,541,693,826.40
ISK
Margin
0.0%
Build Time
15d 2h 40m
1 run

Materials

21 items
Material Quantity Unit Price Total
5 72,200,000.00
18 156,523,114.98
4 43,221,857.92
5 72,738,022.80
2 24,180,000.00
2 27,920,000.00
5 65,380,459.75
2 36,480,000.00
4 57,871,489.36
4 28,576,000.00
18 180,540,000.00
5 93,676,946.10
2 24,525,965.78
8 122,090,256.40
8 106,672,129.36
2 174,110,000.00
2 164,930,000.00
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
1 784,738,461.54
Material Total 2,458,512,575.06
System Cost Index (0.14%) 2,812,892.56
SCC Surcharge (4%) 80,368,358.79
Job Installation Cost 83,181,251.34
Grand Total 2,541,693,826.40

Production Timeline

d
Assembly 15d 2h 40m
1
Chemosh
Chemosh M
1 job, 1 run 15d 2h 40m/job 15d 2h 40m
Total Wall Clock Time 15d 2h 40m

Required Skills