Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Virtuoso Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
13,584,276.72
ISK
Sell Value
0.00
Profit
-13,584,276.72
ISK
Margin
0.0%
Build Time
18h 8m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
Tristan
1 529,445.60
3 1,790.58
6 579,695.22
14 342,862.66
27 256,361.76
27 774,900.00
35 756,186.20
54 980,640.00
54 1,773,338.94
162 5,515,439.04
270 1,539,540.00
Material Total 13,050,200.00
System Cost Index (0.14%) 18,060.57
SCC Surcharge (4%) 516,016.16
Job Installation Cost 534,076.72
Grand Total 13,584,276.72

Production Timeline

d
Assembly 18h 8m 1s
1
Virtuoso
Virtuoso M
1 job, 1 run 18h 8m 1s/job 18h 8m 1s
Total Wall Clock Time 18h 8m 1s

Required Skills