Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

C3-FTM Acid Reaction

Reaction Settings

Reactions have no ME/TE research. Material and time bonuses come from rigs only.

Build Components

| |

Reaction Facility Settings

Total Cost
6,219,139.59
ISK
Sell Value
6,599,000.00
Profit
+379,860.41
ISK
Margin
5.8%
Build Time
2h 24m
1 run

Materials

4 items
Material Quantity Unit Price Total
5 89,250.00
80 197,841.60
100 995,300.00
100 4,713,603.00
Material Total 5,995,994.60
System Cost Index (0.14%) 7,545.97
SCC Surcharge (4%) 215,599.02
Job Installation Cost 223,144.99
Grand Total 6,219,139.59

Production Timeline

d
Assembly 2h 24m
1
C3-FTM Acid
C3-FTM Acid R
1 job, 1 run 2h 24m/job 2h 24m
Total Wall Clock Time 2h 24m

Required Skills

Reactions III