Total Cost
6,844,335.62
ISK
Sell Value
5,986,438.00
Profit
-857,897.62
ISK
Margin
-14.3%
Build Time
2h 24m
1 run

Materials

3 items
Material Quantity Unit Price Total
5 85,039.65
100 847,305.00
100 5,852,855.00
Material Total 6,785,199.65
System Cost Index (0.14%) 1,999.77
SCC Surcharge (4%) 57,136.20
Job Installation Cost 59,135.97
Grand Total 6,844,335.62

Production Timeline

d
Assembly 2h 24m
1
Ferrofluid
Ferrofluid R
1 job, 1 run 2h 24m/job 2h 24m
Total Wall Clock Time 2h 24m