Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dread Guristas Standup Variable Spectrum ECM Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
38,179,853.30
ISK
Sell Value
192,800,000.00
Profit
+154,620,146.70
ISK
Margin
80.2%
Build Time
5h 10m 5s
1 run

Materials

10 items
Material Quantity Unit Price Total
1 25,255,970.15
18 33,210.00
18 9,103.86
20 28,280.00
27 7,843,821.57
30 852,644.40
31 1,798.31
42 126,966.42
48 91,843.68
51 2,053,699.11
Material Total 36,297,337.50
System Cost Index (0.14%) 63,659.95
SCC Surcharge (4%) 1,818,855.85
Job Installation Cost 1,882,515.80
Grand Total 38,179,853.30

Production Timeline

d
Assembly 5h 10m 5s
1
Dread Guristas Standup Variable Spectrum ECM
Dread Guristas Standup Variable Spectrum ECM M
1 job, 1 run 5h 10m 5s/job 5h 10m 5s
Total Wall Clock Time 5h 10m 5s

Required Skills