Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Firbolg I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
8,619,373.43
ISK
Sell Value
14,650,000.00
Profit
+6,030,626.57
ISK
Margin
41.2%
Build Time
1h 17m 32s
1 run

Materials

7 items
Material Quantity Unit Price Total
378 1,110,703.86
495 714,324.60
900 662,031.00
13,500 3,245,130.00
15,750 907,830.00
54,000 987,120.00
175,500 656,370.00
Material Total 8,283,509.46
System Cost Index (0.14%) 11,357.72
SCC Surcharge (4%) 324,506.25
Job Installation Cost 335,863.97
Grand Total 8,619,373.43

Production Timeline

d
Assembly 1h 17m 32s
1
Standup Firbolg I
Standup Firbolg I M
1 job, 1 run 1h 17m 32s/job 1h 17m 32s
Total Wall Clock Time 1h 17m 32s

Required Skills