Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Guided Bomb Launcher II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
179,125,488.92
ISK
Sell Value
389,600,000.00
Profit
+210,474,511.08
ISK
Margin
54.0%
Build Time
12h 7m 37s
1 run

Materials

8 items
Material Quantity Unit Price Total
1 47,840,000.00
5 3,342.95
360 14,764,618.80
360 15,081,472.80
540 10,149,942.60
720 60,494,400.00
720 11,974,053.60
720 12,045,391.20
Material Total 172,353,221.95
System Cost Index (0.14%) 229,013.86
SCC Surcharge (4%) 6,543,253.11
Job Installation Cost 6,772,266.97
Grand Total 179,125,488.92

Production Timeline

d
Assembly 12h 7m 37s
1
Standup Guided Bomb Launcher II
Standup Guided Bomb Launcher II M
1 job, 1 run 12h 7m 37s/job 12h 7m 37s
Total Wall Clock Time 12h 7m 37s