Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Ballistic Control System II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
66,936,486.60
ISK
Sell Value
99,893,333.33
Profit
+32,956,846.73
ISK
Margin
33.0%
Build Time
12h 7m 37s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 1,117,000.00
5 2,057.50
180 14,050,164.60
450 6,750,472.50
450 9,722,394.00
810 32,812,362.90
Material Total 64,454,451.50
System Cost Index (0.14%) 83,933.55
SCC Surcharge (4%) 2,398,101.54
Job Installation Cost 2,482,035.10
Grand Total 66,936,486.60

Production Timeline

d
Assembly 12h 7m 37s
1
Standup Ballistic Control System II
Standup Ballistic Control System II M
1 job, 1 run 12h 7m 37s/job 12h 7m 37s
Total Wall Clock Time 12h 7m 37s