Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Ballistic Control System II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
70,713,745.48
ISK
Sell Value
118,500,000.00
Profit
+47,786,254.52
ISK
Margin
40.3%
Build Time
12h 7m 37s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 6,033,375.00
5 2,471.60
180 14,056,916.40
450 5,832,783.00
450 8,458,285.50
810 33,933,313.80
Material Total 68,317,145.30
System Cost Index (0.14%) 81,044.45
SCC Surcharge (4%) 2,315,555.73
Job Installation Cost 2,396,600.18
Grand Total 70,713,745.48

Production Timeline

d
Assembly 12h 7m 37s
1
Standup Ballistic Control System II
Standup Ballistic Control System II M
1 job, 1 run 12h 7m 37s/job 12h 7m 37s
Total Wall Clock Time 12h 7m 37s