Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Damavik Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
16,875,037.74
ISK
Sell Value
24,570,000.00
Profit
+7,694,962.26
ISK
Margin
31.3%
Build Time
54m 25s
1 run

Materials

11 items
Material Quantity Unit Price Total
28,800 107,712.00
5,400 98,712.00
2,250 129,690.00
450 108,171.00
54 39,721.86
36 51,950.88
18 52,890.66
198 9,901,873.08
135 5,538,059.10
9 411,673.32
5 405,850.85
Material Total 16,846,304.75
System Cost Index (0.14%) 971.65
SCC Surcharge (4%) 27,761.34
Job Installation Cost 28,732.99
Grand Total 16,875,037.74

Production Timeline

d
Assembly 54m 25s
1
Damavik
Damavik M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills