Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Drekavac Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
133,248,808.37
ISK
Sell Value
174,995,798.32
Profit
+41,746,989.95
ISK
Margin
23.9%
Build Time
1h 48m 49s
1 run

Materials

11 items
Material Quantity Unit Price Total
2,772,000 10,367,280.00
990,000 18,097,200.00
178,200 10,267,884.00
19,800 4,759,326.00
11,880 8,836,581.60
6,930 9,997,495.20
3,465 10,155,222.00
572 28,605,462.60
504 20,675,153.52
99 4,524,620.76
50 4,058,508.50
Material Total 130,344,734.18
System Cost Index (0.14%) 98,205.41
SCC Surcharge (4%) 2,805,868.78
Job Installation Cost 2,904,074.19
Grand Total 133,248,808.37

Production Timeline

d
Assembly 1h 48m 49s
1
Drekavac
Drekavac M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills