Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Low-grade Mimesis Epsilon Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
21,654,357.32
ISK
Sell Value
115,000,000.00
Profit
+93,345,642.68
ISK
Margin
81.2%
Build Time
54m 25s
1 run

Materials

5 items
Material Quantity Unit Price Total
12 783,132.00
13 244,793.51
33 909,210.39
89 7,870,270.00
97 11,378,100.00
Material Total 21,185,505.90
System Cost Index (0.14%) 15,854.88
SCC Surcharge (4%) 452,996.54
Job Installation Cost 468,851.42
Grand Total 21,654,357.32

Production Timeline

d
Assembly 54m 25s
1
Low-grade Mimesis Epsilon
Low-grade Mimesis Epsilon M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills

Industry IIII