Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Mimesis Epsilon Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
62,395,118.63
ISK
Sell Value
319,000,000.00
Profit
+256,604,881.37
ISK
Margin
80.4%
Build Time
1h 21m 36s
1 run

Materials

5 items
Material Quantity Unit Price Total
34 2,218,874.00
38 715,550.26
95 2,617,423.85
256 22,638,080.00
280 32,844,000.00
Material Total 61,033,928.11
System Cost Index (0.14%) 46,030.60
SCC Surcharge (4%) 1,315,159.92
Job Installation Cost 1,361,190.52
Grand Total 62,395,118.63

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Mimesis Epsilon
High-grade Mimesis Epsilon M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII