Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Zirnitra Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,358,443,263.24
ISK
Sell Value
5,581,000,000.00
Profit
+2,222,556,736.76
ISK
Margin
39.8%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
2 382,148,148.14
2 1,569,476,923.08
3 366,000,000.00
2 27,920,000.00
6 78,420,000.00
2 24,180,000.00
2 24,525,965.78
9 109,710,000.00
5 72,226,022.30
2 36,480,000.00
2 14,292,000.00
4 43,243,715.84
5 65,429,182.65
4 57,871,489.36
5 93,676,946.10
5 72,738,022.80
18 180,540,000.00
180 14,610,630.60
360 16,466,932.80
Material Total 3,249,955,979.45
System Cost Index (0.14%) 3,668,652.11
SCC Surcharge (4%) 104,818,631.68
Job Installation Cost 108,487,283.79
Grand Total 3,358,443,263.24

Production Timeline

d
Assembly 12d 14h 13m
1
Zirnitra
Zirnitra M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills