Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Nirvana Beta Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
162,759,989.90
ISK
Sell Value
295,198,360.66
Profit
+132,438,370.76
ISK
Margin
44.9%
Build Time
1h 21m 36s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 1,054,000.00
103 1,939,517.81
453 34,780,139.55
488 57,242,400.00
558 63,269,717.22
Material Total 158,285,774.58
System Cost Index (0.14%) 151,301.97
SCC Surcharge (4%) 4,322,913.35
Job Installation Cost 4,474,215.32
Grand Total 162,759,989.90

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Nirvana Beta
High-grade Nirvana Beta M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII