Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Hydra Beta Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
201,782,335.15
ISK
Sell Value
356,463,013.70
Profit
+154,680,678.55
ISK
Margin
43.4%
Build Time
1h 21m 36s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 1,054,000.00
103 1,939,517.81
284 74,582,438.48
488 57,242,400.00
558 63,269,717.22
Material Total 198,088,073.51
System Cost Index (0.14%) 124,926.72
SCC Surcharge (4%) 3,569,334.92
Job Installation Cost 3,694,261.64
Grand Total 201,782,335.15

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Hydra Beta
High-grade Hydra Beta M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII