Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Hydra Epsilon Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
236,455,682.78
ISK
Sell Value
698,500,000.00
Profit
+462,044,317.22
ISK
Margin
66.1%
Build Time
1h 21m 36s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 953,354.67
155 3,333,857.80
303 67,313,528.58
963 81,152,010.00
1,135 78,587,400.00
Material Total 231,340,151.05
System Cost Index (0.14%) 172,989.00
SCC Surcharge (4%) 4,942,542.73
Job Installation Cost 5,115,531.73
Grand Total 236,455,682.78

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Hydra Epsilon
High-grade Hydra Epsilon M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII