Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ultradian-Cycling Neurolink Stabilizer Reaction

Reaction Settings

Reactions have no ME/TE research. Material and time bonuses come from rigs only.

Build Components

| |

Reaction Facility Settings

Total Cost
2,629,020.68
ISK
Sell Value
3,258,000.00
Profit
+628,979.32
ISK
Margin
19.3%
Build Time
2h 24m
1 run

Materials

4 items
Material Quantity Unit Price Total
5 89,271.55
10 1,559,030.00
10 334,600.00
1 565,919.03
Material Total 2,548,820.58
System Cost Index (0.14%) 2,712.08
SCC Surcharge (4%) 77,488.02
Job Installation Cost 80,200.10
Grand Total 2,629,020.68

Production Timeline

d
Assembly 2h 24m
1
Ultradian-Cycling Neurolink Stabilizer
Ultradian-Cycling Neurolink Stabilizer R
1 job, 1 run 2h 24m/job 2h 24m
Total Wall Clock Time 2h 24m

Required Skills