Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

U-C Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,271,647.16
ISK
Sell Value
16,369,360.61
Profit
+2,097,713.45
ISK
Margin
12.8%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 28,674.00
9 29,826.18
36 13,663,550.16
1 40,775.14
Material Total 13,762,825.48
System Cost Index (0.14%) 17,206.53
SCC Surcharge (4%) 491,615.15
Job Installation Cost 508,821.68
Grand Total 14,271,647.16

Production Timeline

d
Assembly 1h 37m 56s
1
U-C Trigger Neurolink Conduit
U-C Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III