Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

R-O Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
18,290,954.45
ISK
Sell Value
23,964,786.24
Profit
+5,673,831.79
ISK
Margin
23.7%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 28,674.00
9 29,823.48
36 17,693,394.48
1 58,229.26
Material Total 17,810,121.22
System Cost Index (0.14%) 16,260.06
SCC Surcharge (4%) 464,573.17
Job Installation Cost 480,833.23
Grand Total 18,290,954.45

Production Timeline

d
Assembly 1h 37m 56s
1
R-O Trigger Neurolink Conduit
R-O Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III