Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

S-R Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
16,637,133.48
ISK
Sell Value
18,421,860.94
Profit
+1,784,727.46
ISK
Margin
9.7%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 28,674.00
9 29,826.18
36 15,861,600.00
1 235,432.67
Material Total 16,155,532.85
System Cost Index (0.14%) 16,286.01
SCC Surcharge (4%) 465,314.62
Job Installation Cost 481,600.63
Grand Total 16,637,133.48

Production Timeline

d
Assembly 1h 37m 56s
1
S-R Trigger Neurolink Conduit
S-R Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III