Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

G-O Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
12,479,062.74
ISK
Sell Value
14,412,354.21
Profit
+1,933,291.47
ISK
Margin
13.4%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 26,181.36
9 27,807.93
36 11,825,020.80
1 210,079.25
Material Total 12,089,089.34
System Cost Index (0.14%) 13,187.51
SCC Surcharge (4%) 376,785.89
Job Installation Cost 389,973.40
Grand Total 12,479,062.74

Production Timeline

d
Assembly 1h 37m 56s
1
G-O Trigger Neurolink Conduit
G-O Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III