Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

G-O Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
12,190,085.73
ISK
Sell Value
15,078,470.81
Profit
+2,888,385.08
ISK
Margin
19.2%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 28,674.00
9 29,826.18
36 11,541,240.36
1 165,621.92
Material Total 11,765,362.46
System Cost Index (0.14%) 14,362.62
SCC Surcharge (4%) 410,360.65
Job Installation Cost 424,723.27
Grand Total 12,190,085.73

Production Timeline

d
Assembly 1h 37m 56s
1
G-O Trigger Neurolink Conduit
G-O Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III