Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Probe Fleet Issue Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,307,560.65
ISK
Sell Value
8,676,024.39
Profit
+7,368,463.74
ISK
Margin
84.9%
Build Time
54m 25s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 402,847.30
9 22,248.99
9 414,089.01
18 23,276.52
27 18,947.52
450 81,963.00
2,250 110,520.00
5,400 99,954.00
28,800 109,728.00
Material Total 1,283,574.34
System Cost Index (0.14%) 811.13
SCC Surcharge (4%) 23,175.18
Job Installation Cost 23,986.31
Grand Total 1,307,560.65

Production Timeline

d
Assembly 54m 25s
1
Probe Fleet Issue
Probe Fleet Issue M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills