Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Catalyst Navy Issue Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,833,959.86
ISK
Sell Value
19,328,372.09
Profit
+17,494,412.23
ISK
Margin
90.5%
Build Time
1h 21m 36s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 402,847.30
9 22,248.99
9 414,089.01
18 23,276.52
27 18,947.52
900 163,926.00
4,500 221,040.00
13,500 249,885.00
72,000 274,320.00
Material Total 1,790,580.34
System Cost Index (0.14%) 1,466.94
SCC Surcharge (4%) 41,912.58
Job Installation Cost 43,379.52
Grand Total 1,833,959.86

Production Timeline

d
Assembly 1h 21m 36s
1
Catalyst Navy Issue
Catalyst Navy Issue M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills