Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Thrasher Fleet Issue Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,927,708.61
ISK
Sell Value
20,028,181.82
Profit
+18,100,473.21
ISK
Margin
90.4%
Build Time
1h 21m 36s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 405,850.85
9 26,377.20
9 411,329.16
18 25,967.52
27 20,083.14
900 216,333.00
4,500 259,290.00
13,500 246,780.00
72,000 269,280.00
Material Total 1,881,290.87
System Cost Index (0.14%) 1,569.68
SCC Surcharge (4%) 44,848.06
Job Installation Cost 46,417.74
Grand Total 1,927,708.61

Production Timeline

d
Assembly 1h 21m 36s
1
Thrasher Fleet Issue
Thrasher Fleet Issue M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills