Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Valravn Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
5,421,679,254.61
ISK
Sell Value
0.00
Profit
-5,421,679,254.61
ISK
Margin
0.0%
Build Time
25d 21h 52m
1 run

Materials

11 items
Material Quantity Unit Price Total
Naglfar
1 2,186,000,000.00
90 53,717.40
360 90,144,000.00
360 98,802,928.80
810 170,343,000.00
810 324,000,000.00
1,350 501,284,889.00
1,350 782,292,789.00
1,530 872,100,000.00
1,800 17,088,408.00
3,600 77,435,892.00
Material Total 5,119,545,624.20
System Cost Index (0.14%) 10,217,079.29
SCC Surcharge (4%) 291,916,551.12
Job Installation Cost 302,133,630.41
Grand Total 5,421,679,254.61

Production Timeline

d
Assembly 25d 21h 52m
1
Valravn
Valravn M
1 job, 1 run 25d 21h 52m/job 25d 21h 52m
Total Wall Clock Time 25d 21h 52m