Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Squall Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
14,182,910.85
ISK
Sell Value
19,067,101.45
Profit
+4,884,190.60
ISK
Margin
25.6%
Build Time
1h 48m 49s
1 run

Materials

9 items
Material Quantity Unit Price Total
18 1,461,063.06
36 1,645,316.64
126 369,280.80
315 454,431.60
1,350 1,004,157.00
9,000 2,163,330.00
32,400 1,866,888.00
162,000 2,961,360.00
486,000 1,817,640.00
Material Total 13,743,467.10
System Cost Index (0.14%) 14,860.42
SCC Surcharge (4%) 424,583.34
Job Installation Cost 439,443.75
Grand Total 14,182,910.85

Production Timeline

d
Assembly 1h 48m 49s
1
Squall
Squall M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills