Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Torrent Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
144,080,750.11
ISK
Sell Value
235,655,263.16
Profit
+91,574,513.05
ISK
Margin
38.9%
Build Time
1d 7h 5m
1 run

Materials

11 items
Material Quantity Unit Price Total
Squall
1 15,071,142.86
14 8,356.04
41 1,242,710.00
68 1,088,000.00
95 2,043,332.20
122 132,980.00
203 1,950,627.00
270 26,613.90
338 6,261,943.48
1,620 84,288,600.00
4,725 26,420,357.25
Material Total 138,534,662.73
System Cost Index (0.14%) 187,548.85
SCC Surcharge (4%) 5,358,538.54
Job Installation Cost 5,546,087.38
Grand Total 144,080,750.11

Production Timeline

d
Assembly 1d 7h 5m
1
Torrent
Torrent M
1 job, 1 run 1d 7h 5m/job 1d 7h 5m
Total Wall Clock Time 1d 7h 5m