Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Advanced Logistics Network Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
219,537,468.66
ISK
Sell Value
315,100,000.00
Profit
+95,562,531.34
ISK
Margin
30.3%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
6 50,124,000.00
9 19,836,000.00
9 16,481,012.76
13 23,634,870.09
13 18,879,384.29
13 24,185,186.35
19 20,026,000.00
19 18,493,117.62
19 20,672,000.00
Material Total 212,331,571.11
System Cost Index (0.14%) 243,677.69
SCC Surcharge (4%) 6,962,219.85
Job Installation Cost 7,205,897.55
Grand Total 219,537,468.66

Production Timeline

d
Assembly 9h 4m 1s
1
Advanced Logistics Network
Advanced Logistics Network M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII