Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Isogen Prospecting Array 2 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
85,334,020.49
ISK
Sell Value
242,600,000.00
Profit
+157,265,979.51
ISK
Margin
64.8%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 9,088,343.00
4 8,824,000.00
7 7,413,000.00
8 7,789,921.36
5 7,289,648.60
5 9,492,278.50
8 8,791,552.88
4 7,362,445.68
2 16,716,000.00
Material Total 82,767,190.02
System Cost Index (0.14%) 86,801.03
SCC Surcharge (4%) 2,480,029.44
Job Installation Cost 2,566,830.47
Grand Total 85,334,020.49

Production Timeline

d
Assembly 9h 4m 1s
1
Isogen Prospecting Array 2
Isogen Prospecting Array 2 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII