Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Tritanium Prospecting Array 1 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
44,502,441.07
ISK
Sell Value
137,000,000.00
Profit
+92,497,558.93
ISK
Margin
67.5%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
1 7,148,000.00
2 4,474,000.00
2 3,950,276.28
3 5,724,000.00
3 3,676,030.59
3 5,401,610.13
4 3,813,433.68
4 3,843,353.32
4 5,147,570.16
Material Total 43,178,274.16
System Cost Index (0.14%) 44,778.59
SCC Surcharge (4%) 1,279,388.32
Job Installation Cost 1,324,166.91
Grand Total 44,502,441.07

Production Timeline

d
Assembly 9h 4m 1s
1
Tritanium Prospecting Array 1
Tritanium Prospecting Array 1 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII