Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Tritanium Prospecting Array 1 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
45,677,833.57
ISK
Sell Value
118,000,000.00
Profit
+72,322,166.43
ISK
Margin
61.3%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
1 8,356,000.00
2 4,412,141.04
2 3,666,797.18
3 5,459,785.65
3 4,359,061.95
3 5,587,706.73
4 4,223,280.32
4 3,893,472.32
4 4,360,000.00
Material Total 44,318,245.19
System Cost Index (0.14%) 45,976.42
SCC Surcharge (4%) 1,313,611.96
Job Installation Cost 1,359,588.38
Grand Total 45,677,833.57

Production Timeline

d
Assembly 9h 4m 1s
1
Tritanium Prospecting Array 1
Tritanium Prospecting Array 1 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII