Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Tritanium Prospecting Array 2 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
85,011,982.66
ISK
Sell Value
739,800,000.00
Profit
+654,788,017.34
ISK
Margin
88.5%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 9,099,642.75
4 8,824,282.08
7 7,390,740.56
8 7,786,944.64
5 7,265,103.25
5 9,312,844.55
8 8,720,000.00
4 7,333,594.36
2 16,712,000.00
Material Total 82,445,152.19
System Cost Index (0.14%) 86,801.03
SCC Surcharge (4%) 2,480,029.44
Job Installation Cost 2,566,830.47
Grand Total 85,011,982.66

Production Timeline

d
Assembly 9h 4m 1s
1
Tritanium Prospecting Array 2
Tritanium Prospecting Array 2 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII