Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

1200mm Artillery Cannon I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
2,094,310.34
ISK
Sell Value
2,155,833.33
Profit
+61,522.99
ISK
Margin
2.9%
Build Time
24m 29s
1 run

Materials

7 items
Material Quantity Unit Price Total
81,961 306,534.14
21,175 387,079.00
7,752 446,670.24
2,065 496,364.05
292 217,195.44
17 24,524.88
47 137,747.60
Material Total 2,016,115.35
System Cost Index (0.14%) 2,644.28
SCC Surcharge (4%) 75,550.72
Job Installation Cost 78,194.99
Grand Total 2,094,310.34

Production Timeline

d
Assembly 24m 29s
1
1200mm Artillery Cannon I
1200mm Artillery Cannon I M
1 job, 1 run 24m 29s/job 24m 29s
Total Wall Clock Time 24m 29s

Required Skills