Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

1400mm Howitzer Artillery I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
2,304,085.87
ISK
Sell Value
2,221,743.74
Profit
-82,342.13
ISK
Margin
-3.7%
Build Time
24m 29s
1 run

Materials

7 items
Material Quantity Unit Price Total
102,492 389,469.60
26,293 486,683.43
8,773 430,929.76
2,385 434,475.45
370 259,536.50
38 49,139.32
67 165,620.65
Material Total 2,215,854.71
System Cost Index (0.14%) 2,983.66
SCC Surcharge (4%) 85,247.49
Job Installation Cost 88,231.16
Grand Total 2,304,085.87

Production Timeline

d
Assembly 24m 29s
1
1400mm Howitzer Artillery I
1400mm Howitzer Artillery I M
1 job, 1 run 24m 29s/job 24m 29s
Total Wall Clock Time 24m 29s

Required Skills