Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sarathiel Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,546,926,909.84
ISK
Sell Value
0.00
Profit
-2,546,926,909.84
ISK
Margin
0.0%
Build Time
16d 8h 53m
1 run

Materials

21 items
Material Quantity Unit Price Total
1 191,074,074.07
1 784,738,461.54
2 24,180,000.00
2 27,920,000.00
2 24,525,965.78
2 160,537,931.04
2 164,930,000.00
4 43,221,857.92
4 57,871,489.36
4 28,576,000.00
5 72,738,022.80
5 65,380,459.75
5 93,676,946.10
8 127,680,000.00
8 106,672,129.36
9 129,960,000.00
9 78,261,557.49
9 164,160,000.00
9 90,270,000.00
180 14,610,630.60
360 16,453,166.40
Material Total 2,467,438,692.21
System Cost Index (0.14%) 2,688,007.36
SCC Surcharge (4%) 76,800,210.27
Job Installation Cost 79,488,217.63
Grand Total 2,546,926,909.84

Production Timeline

d
Assembly 16d 8h 53m
1
Sarathiel
Sarathiel M
1 job, 1 run 16d 8h 53m/job 16d 8h 53m
Total Wall Clock Time 16d 8h 53m

Required Skills