Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Workforce Mecha-Tooling 2 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
174,825,395.91
ISK
Sell Value
546,700,000.00
Profit
+371,874,604.09
ISK
Margin
68.0%
Build Time
9h 4m 1s
1 run

Materials

10 items
Material Quantity Unit Price Total
2 14,296,000.00
9 17,172,000.00
9 20,133,000.00
9 16,204,830.39
9 17,776,243.26
18 17,160,451.56
18 17,295,089.94
18 22,056,183.54
18 23,164,065.72
900 4,590,432.00
Material Total 169,848,296.41
System Cost Index (0.14%) 168,307.71
SCC Surcharge (4%) 4,808,791.79
Job Installation Cost 4,977,099.50
Grand Total 174,825,395.91

Production Timeline

d
Assembly 9h 4m 1s
1
Workforce Mecha-Tooling 2
Workforce Mecha-Tooling 2 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII